Location : Irvona, IL
Posted on: Sep 19, 2012

We are building a two phase Self Storage facility and are requesting bids on phase one of the project consisting of 142 units.We would like bids on the following. (1)Forming, pouring, sealing, and sawing two floating pads totaling approximately 440 yards of concrete. (2)Erecting two buildings on the previously described pads.